PETRONAS has awarded the contract Provision of Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) of Central Processing Platform (CPP) for Bokor Phase 3 Redevelopment to Malaysia Marine and Heavy Engineering Holdings Berhad (MMHE).

The main objective of the redevelopment project is to develop 101.4 MMstb of Bokor reserves and 9.0 MMstb of Betty reserves through combination of infill drilling and immiscible Water Alternate Gas (iWAG) injection. The development concept require a new CPP to facilitate EOR activities in Bokor field. TCRSB awarded the contract in 2018.

TCRSB scope of supply:

  • 30-inch HP Flare Tip with pilot assemblies
  • 30-inch LP Flare Tip with pilot assemblies
  • Flare ignition package – FFG as primary ignition